Your office standards become a shared clause library, with variants for each kind of project and AI routines that check every Division 01 before you issue it.

Division 01 for The Terraces at Vallon Park in There, with the AIโ‹…there panel

One Division 01 per project. And every time, the same file to dig up.

One Division 01 per project. And every time, the same file to dig up.

One Division 01 per project. And every time, the same file to dig up.

Division 01 usually starts from the last projectโ€™s. You reopen the file, change the address, the work hours, the schedule, and hope nothing slipped. The errors donโ€™t show in review: they show on site, when a contractor uses Division 01 to push back.

With Word

Start from the last projectโ€™s

Find the right version

Proofread every page before issuing

Miss a mismatched address

With There

Approved clauses, with their variants

Approved clauses, with their variants

Type / and pick the right variant

A routine reviews the whole document

Fixes you approve

Division 01 in two minutes

Division 01 in two minutes

Division 01 in two minutes

What goes in Division 01?

What goes in Division 01?

What goes in Division 01?

Division 01 โ€” General Requirements covers administration, coordination, submittals, temporary facilities, quality and closeout for one project. The design team writes it into the Project Manual, often with a specification writer, and it binds every contractor through the contract documents.

01 10 00 Summary: project information sheet in Division 01

Summary of work

Scope, constraints, neighbors, project team and distribution.

Project meetings in Division 01: OAC meetings, minutes and recording

Project management

OAC meetings, meeting reports, scheduling, liquidated damages.

01 50 00 Temporary facilities and controls: site logistics plan

Temporary facilities

Site trailers, logistics plan by phase, access, deliveries, laydown, hoisting.

Work hours in Division 01, with the school next door

Work restrictions

Work hours, noise, neighbors, sites next to a school or occupied buildings.

Submittal procedures and review times in Division 01

Submittals

Shop drawings, product data, review times, RFIs.

Closeout procedures and closeout submittals in Division 01

Schedule and closeout

Phasing, milestones, punch list, closeout documents.

From the library to the issued document

From the library to the issued document

From the library to the issued document

Work hours snippet and its variants

Library

1. The snippet library

1. The snippet library

Your approved clauses, organized like your Division 01 and shared with the team. Each snippet has variants, each with a โ€œwhen to useโ€ note: standard hours, 7 a.m. to 7 p.m., extended hours, or a sensitive site with 7 daysโ€™ notice.

Variants

Variants

Whole team

Whole team

Callouts

Callouts

Tables

Tables

Writing

2. Type /, pick the variant

2. Type /, pick the variant

Type / in the document. There suggests the snippet, then its variants, with a preview in place. The site borders a school? Pick Sensitive site: the table and callouts follow.

Slash menu

Slash menu

Preview

Preview

Sensitive site

Sensitive site

Margin bubble

Margin bubble

Slash menu and variants in Division 01
Modified snippet and its menu

Adapting

3. Modified snippet: you decide

3. Modified snippet: you decide

The modified snippet turns orange. Changing the notice period from 7 to 10 days? Your call: update the variant, create a new one, restore the original, or detach.

Update

Update

New variant

New variant

Restore

Restore

Detach

Detach

Review

4. A routine reviews the whole document

4. A routine reviews the whole document

A quality check you save once. Run it in one click from AIโ‹…there, written in your own words as the architect, with your Division 01 template as the reference. Every discrepancy gets a comment with the expected fix. Custom routines come with the Business plan.

Your words

Your words

Template

Template

Severity

Severity

One click

One click

Routine comments on Division 01
Fixes suggested by AIโ‹…there

Fixing

5. AIโ‹…there fixes, you approve

5. AIโ‹…there fixes, you approve

AI suggests, you decide. AIโ‹…there fixes the document from the comments. Every change is highlighted: Accept, Reject or Accept All.

Manual mode

Manual mode

Highlights

Highlights

Accept All

Accept All

Comments

Comments

New project

6. The next project starts from the template

6. The next project starts from the template

Your next Division 01 starts from your snippets. Use template creates a document thatโ€™s current with the library, and the project information sheet steers the right variants. Snippets to check are outlined in orange.

Use template

Use template

Project info

Project info

To check

To check

Read-only

Read-only

Project information sheet in Division 01

The example: The Terraces at Vallon Park (fictional project)

The example: The Terraces at Vallon Park (fictional project)

The example: The Terraces at Vallon Park (fictional project)

48 apartments in a five-story building over 52 below-grade parking stalls, two retail spaces, a 22-month build next to a school. Two errors slipped into Division 01. The routine flagged three discrepancies.

Routine comment on the address

Critical ยท Address

Site access says 14 Hillside Avenue, the header says 12. Expected fix: one address.

Routine comment on work hours

Major ยท Work hours

Site supervision says 6:30 a.m. to 8 p.m., Work hours says 7 a.m. to 7 p.m. Fix: one time window.

Routine comment on the school next door

Major ยท School next door

The site borders a school, but Division 01 sets no limits on work hours. Fix: spell out the restrictions.

Word, Specpoint, SpecLink โ€” or There?

Word, Specpoint, SpecLink โ€” or There?

Word, Specpoint, SpecLink โ€” or There?

Spec platforms bring reference content and AI review. There brings your own office standards and your own checks, from bid to closeout.

Several versions of Division 01 in a Word folder

Word and office masters

Familiar and flexible. Consistency depends on your templates and on whoever proofreads before issue.

A spec platform: Project Manual sections and AI review flags

Specpoint, SpecLink

MasterSpec or SpecLink content, office masters, and AI that flags omissions and inconsistencies. Built for the Project Manual, up to bid.

The Division 01 snippet library in There, organized by MasterFormat section

There

Your approved clauses and variants, checked by routines your team writes in its own words. The same workspace then carries OAC minutes and field reports through construction.

Frequently asked questions

Frequently asked questions

Frequently asked questions

Can we bring in our current Division 01 or office master from Word?

Yes. Send it to us: we break it into snippets and variants, ready in your library.

Who can edit the library?

You choose who sees each library: Only me, Everyone in the organization, or a Team space.

We already use Specpoint or SpecLink. Do we need to switch?

No. Keep them for your master specifications. Teams use There for the parts they rewrite on every project, such as Division 01, and for the documents that follow on site: OAC minutes and field reports. There exports to PDF, not to Word.

Does AI change the document without me?

No. In Manual mode, every change waits for your approval: Accept, Reject or Accept All.

Do snippets work in meeting reports too?

Yes. The same library feeds Division 01 and the general requirements in your meeting reports.

Which plan do I need?

Shared libraries come with the Team plan, custom routines with the Business plan. The 14-day trial runs on Team, so custom routines aren't included. Details on the pricing page.

Your office standards, in every Division 01.

Your office standards, in every Division 01.

Your office standards, in every Division 01.

No credit card required.