Design meeting minutes, from schematic design to bid set.
For architects and consulting engineers. Each set of minutes starts from the last one, open items carried forward. Record the meeting and the note merges in. The owner reads them from a link, no account, and you see who opened them.



When the minutes go out late, every meeting reopens the last one’s decisions.
During design, you meet every week and a lot is decided out loud. Without minutes, the owner revisits an option and a consultant works from an old revision. When minutes exist, they’re rebuilt by hand and emailed as a PDF, read or not.
With Word and email
Decisions scattered across meetings and emails
Minutes rebuilt by hand, issued days later
Drawings and photos sent as separate attachments
Notes taken in the meeting, retyped that night
A PDF sent out, no idea who read it
With There
Decisions called out: who, what, when
The next set ready, open items carried forward
Drawings and photos inline, readable on a phone
The meeting recorded and merged into the minutes
One link per recipient, with read tracking
Design meeting minutes are the architect’s written record of each design meeting, from schematic design to the bid set: the options presented, the owner’s decisions, and each party’s action items. Issued after every meeting, they document what was decided, by whom, and what the architect recommended.

Project kickoff and program
Program, project budget, and design schedule, agreed at the first meeting.

Design team coordination
Options compared, revised drawings and each consultant’s action items, meeting after meeting.

Phase approval and cost decisions
What the owner approves, with any conditions, and which value engineering items they accept.

Owner and user group review
Feedback and sign-off on the design: what stays, what doesn’t, and why.

Permits, historic review, and code
Comments from reviewing agencies and consultants, and the architect’s response, with a due date.

Bid set review
Drawings and specifications coordinated, code review attached, bid date set.
Design meeting minutes template: what to include
What they include
The phase and drawings reviewed, with revision
Each owner decision, who made it, and when
The options studied and the one selected
Action items with an assignee and due date
The architect’s recommendations, in writing
The corrections period and distribution list
Common pitfalls
“Approved,” without saying which revision
Decisions buried in the text, or sent by text
A cost with no date or budget comparison
User comments recorded as requirements
Advice given out loud, never put in writing
Minutes sent to all, no decision-maker named
Before the meeting, during it, and after the minutes go out.
At your desk, before the meeting
Start from the last minutes
You walk into the meeting with the minutes ready.
In the meeting, with the mobile app
Record the meeting
You listen instead of taking notes.
At your desk, after the meeting
Merge the note into the minutes
The minutes fill in. You review instead of retyping.
At your desk, after the meeting
Review and decide
AI suggests. You decide.
With your recipients
Share and see who read them
You know who read them. And who didn’t.
A 12,400 sq ft renovation plus a 4,500 sq ft addition, in DD. Minutes #7: 4 owner decisions and 11 action items, 4 carried forward from #6.

Decision · Approved with conditions
Who decided, when, and on which revision, on record through the bid set.
Action item · Carried forward from minutes #6
The item left open in #6 carries forward with its original due date, so the slip shows.
Recommendation · Addition roof
The architect’s recommendation is on record before the steering committee decides.
Based on vendor websites, checked 11/21/2026. Word, Copilot, Cogram, Plaud, Procore, and Forma Build are trademarks of their respective owners.

Word
Great for formatting a document everyone can open. The next set starts from a copy: open items get sorted and retyped by hand, and the PDF goes out by email.

Cogram
Built for architects: it drafts minutes in your template from online or in-person meetings, speakers shown as “Speaker 1, 2” until renamed. Its site doesn’t describe carry-forward or read tracking (11/21/2026).

There
The next set is already prepared, open items carried forward. The meeting merges into the minutes, new content in blue. One link per recipient, and you see who read it.
Can I use my Word template?
Yes. Import your .docx file: it becomes an editable There document. Document templates and shared snippet libraries come with the Team plan.
How do I add drawings and photos?
Drag them into the minutes. Several photos form a gallery: automatic layout or 1 to 4 columns, no table needed to line them up, and the layout holds when the text changes. Add a caption, mark up a drawing with arrows, shapes and text, or crop it, without losing the original. The PDF export compresses photos to keep the file light, and the originals stay downloadable. Readers tap a photo to open it full screen, on a phone or a laptop. Nearly 8 in 10 design minutes in There include drawings or photos (There usage data, Nov. 2026).
Do I have to record the meeting?
No, but it’s the fastest way. If the minutes include a dated meeting block, the app suggests the meeting when it starts, with the attendees from the minutes. You can also type or dictate your notes afterward; they merge the same way.
What if the transcript gets something wrong?
The merge marks everything it added in blue, so you review those passages first. A misheard decision takes one request to AI⋅there, which proposes the change for you to accept or reject. Nothing goes out before you review it.
Do the owner and consultants need an account?
No. Each recipient gets their own link and reads the minutes on a phone or a laptop. Design minutes go to a median of 16 recipients, nearly 9 out of 10 outside the firm (There usage data, all markets, Nov. 2026).
If the owner opened the minutes, does that mean they’re approved?
No. Read doesn’t mean approved. A review period (for example, “These minutes stand as recorded unless corrections are received in writing within seven days”) is a project rule; how much weight it carries depends on your contract. There records who received and opened the minutes, recipient by recipient; you write the rule at the top of each set.
Can I lock the issued version?
Yes. The minutes stay editable after sharing, until they’re locked: by you (Lock button), automatically, a number of days after sending that you set when you share (for example, at the end of the corrections period), or at the first signature when the minutes include a signature block. Locking closes edits and comments, and a locked document can never be unlocked, even by its author.
I already use an AI notetaker (Copilot, Plaud). What does There add?
Microsoft 365 Copilot summarizes Teams meetings with its own license; a recap after the meeting needs transcription or recording turned on. Plaud records an in-person meeting and summarizes it. Either way, you get a summary of one conversation: it doesn’t start from your last minutes or bring back their open items. With There, recording starts from the minutes: the meeting and its attendees are known, the note merges into the minutes, and the next set starts from this one, with sharing and read tracking.
Do I need everyone’s consent to record?
Plan on it. There asks for your consent before your first recording, but that covers your own voice only; informing everyone else is up to your firm. Several states, including California, Florida, Illinois, Maryland, Massachusetts, Pennsylvania, and Washington, require the consent of everyone in the conversation, and when people join from several states, follow the strictest rule. Some owners also restrict recording or AI notetakers in their contracts. Add a short notice to the next-meeting block of the minutes you send ahead, then ask everyone to agree out loud before the discussion starts. If anyone declines, don’t record: type or photograph your notes instead. This is general information, not legal advice.
What happens to the audio and the transcript?
They stay with the note and follow its visibility: anyone who can read the note can play the audio. Set the note to private if the recording should stay with you. To delete a recording, contact support. The record of the meeting is the minutes you issue, not the transcript.
Where is our data stored? Is it used to train AI?
There is a French company. Core data is stored and processed in Europe, with the database in Frankfurt, Germany; some services, such as sign-in and certain AI features, may process data outside the EU under contractual safeguards. Audio is transcribed on European infrastructure. Your data is not used to train AI models. AI features use models from OpenAI, Anthropic, Google, and Mistral AI, and each request sends only the data it needs. A data processing agreement (DPA) is available.
I already use meetings in Procore or Forma Build (formerly Autodesk Build). Why There?
Those tools carry open items into a follow-up meeting inside the project platform, and they work well once a contractor runs the project there. There covers the meeting itself: you record it, the note merges into the minutes, and the owner and each consultant read from their own link, no account needed, with read tracking. Design meetings often happen before a contractor is on board.
What about OAC meeting minutes?
Same tool. Design and construction often overlap: design minutes and OAC (owner-architect-contractor) minutes sit in the same project folder, with the same sharing and read tracking.
Which plan do I need?
Free covers the mobile app with meeting recording, 5 documents a month, one link per recipient with no account, read tracking, and reminders. Prepare next document starts on Pro; note merging and AI⋅there start on Team. Prices are per organization, with unlimited users: see Pricing for current plans. The 14-day trial runs on Team, no credit card required.
Learn more: Sharing and read tracking · OAC meeting minutes · Field report