Closed items

Closed items: what the Architect needs to know so the minutes get shorter without losing what was settled.

The minutes are 28 pages long. Two thirds of the items were settled months ago but still appear every week. Readers skip pages and miss the two new urgent items. Closing items, with a date, is how the minutes stay readable and keep the record.

Type

Phase

Parties

Impact

Stake

Where in the minutes

Tracking status

Construction

Architect, Contractor, Owner

Medium

Readability, traceability

Status column, closed items log

1. Definition and common mistake

A closed item is one whose action is done or no longer needed. It is marked closed with its closing date and, ideally, a short reason: document received, work completed, decision made. It appears once as closed, then leaves the active minutes and moves to a log or archive.

It's an industry usage term. Closing an item doesn't waive anything; it records that the action was completed. Items with contract consequences (changes, claims, notices) close only when the related instrument is issued.

Common mistake: deleting items without recording when and why they closed. Months later, nobody can show what happened.

2. When it appears

Each meeting, as items are completed, and in periodic clean-ups. Variants: “Closed”, “Complete”, “Done”, “Removed from minutes”.

Typical wording: “Item 7.12, layout survey: received 03/14. Closed.” “Items 4.01 to 4.09 closed and moved to the closed items log.”

3. How to read it in the minutes

If an item disappears without being marked closed → ask for its closing date.

If a change item is closed → check the Change Order number.

If a party disagrees with a closing → record its position and reopen if needed.

If the minutes keep growing → propose a clean-up of closed items.

4. Who does what

Party

What closing means to them

What they do

Architect

Readable minutes

Close with dates, keep the log

Contractor

Recognition of completion

Report completion in writing

Owner

Confirmation

Object if not satisfied

5. What it changes in practice

Minutes that close items regularly stay short and focused. Minutes that don't become unreadable, and important items get lost.

Failure scenario: an item is quietly deleted. At closeout, the Owner says the work was never done; nobody can show when or why it was closed.

6. Typical wording

“Item 9.04 closed 03/14: survey received.”

“Closed items log updated, 26 items. Available on request.”

7. What to watch

  • Mark each closing with a date and reason.

  • Keep a closed items log.

  • Close contract-related items only with the instrument.

  • Let parties object to a closing.

  • Clean up minutes regularly.

8. Don't confuse with

Related term

Key difference

Info item

Still open for information

Follow-up item

Still open and late

Punch list closeout

Physical work verified

Change Order

Closes a change item

9. Related terms

Same phase (construction): Action item · Info item · Follow-up item · Purpose of meeting minutes

Same party (Architect): OAC meeting · Ball in court · Closeout submittals · Changes in the Work

<-