Owner

Owner: what the Architect needs to know so an Owner decision is recorded in the Owner's name.

Design meeting #7. "Accepted by the Architect: resilient flooring instead of tile in the offices." The change affects price and use. The decision belonged to the Owner, and the minutes don't say the Owner made it.

Type

Phase

Parties

Impact

Stake

Where in the minutes

Contract party

Whole project

Owner, Owner's rep, Architect, Contractor

Program, budget, schedule

Decisions in the right name

Attendance, decisions, action items

1. Definition and common mistake

The Owner is the party for whom the project is built and who pays for it. It defines the program and budget, hires the Architect (for example under AIA B101) and the Contractor (A101 with the A201 General Conditions), and makes decisions that change scope, price or time. A201 Article 2 sets its duties, including designating a representative with authority to bind the Owner.

Common mistake: recording an Owner decision without saying the Owner made it, or attributing it to someone without authority. What changes the program, the price or the time is an Owner decision: write it in the Owner's name, with the person and the date.

2. When it appears

The Owner appears in the attendance list, in decisions ("approved by the Owner"), in change approvals and in items awaiting an answer ("Owner to confirm"). Variants: "Owner's rep", "OR", "client", "user group", "facilities", "board".

  • "Owner (facilities director) approves Alternate 3; Change Order to follow."

  • "User group prefers sliding doors; decision pending Owner's rep by 06/10."

3. How to read it in the minutes

  • If you read "approved" with no name → ask who approved: the Owner, its representative or the Architect.

  • If you read "user group request" → users advise; the Owner decides and pays.

  • If you read "Owner to confirm" → put it on the action list with a date.

  • If you read "agreed with the client" on a cost item → a Change Order or CCD is still needed.

4. Who does what

Party

What it means to them

What they do

Owner

It decides and pays

Approves phases, changes and payments in writing

Owner's rep / PM

It speaks for the Owner within its authority

Confirms decisions, escalates what exceeds its authority

Architect

It advises and records

Presents options with cost and time, writes each decision in the Owner's name

Contractor

It acts on Owner decisions

Prices and proceeds only on written authorization

5. What it changes in practice

Minutes that say who decided, for whom and when, survive a change of project manager or a dispute. Failure scenario: a flooring change noted as "accepted" without a name is installed. At closeout the Owner refuses the extra cost, arguing it never approved it.

6. Typical wording

"Decision 4 · The Owner (project manager) approves resilient flooring in offices 201–214, cost increase to be confirmed by Change Order. 11/24."

"Owner's rep to confirm the hardware finish by 12/01; the door schedule is on hold until then."

7. What to watch

  • Write the name and role of the person who decides for the Owner.

  • Check what the Owner's rep can approve on its own.

  • Separate user requests from Owner decisions.

  • Date every decision.

  • Follow every cost decision with a Change Order or CCD.

  • Keep the Owner in the distribution list of every set of minutes.

8. Don't confuse with

Related term

Key difference

Owner's rep

Acts for the Owner within delegated authority

User group

Advises on needs; doesn't commit money

Architect

Advises and certifies; doesn't spend the Owner's money

Construction manager (agency)

Advises the Owner; not the Owner

9. Related terms

Same party: Architect, Consulting engineers, Change Order. Same phase: Design phases, Bid documents.

Sources: AIA A201–2017, Article 2 (Owner) · AIA B101–2017 summary

Template: Design meeting minutes

<-