PDP: a French term you'll meet in French meeting minutes, with its closest US equivalent.
On a French renovation inside an operating hospital, the minutes say: “PDP to be signed with the facility before any work in the basement.” A US reader will recognize an owner's contractor safety program, with its orientation and permits, in an occupied facility.
Type | Phase | Parties | Impact | Stake | Where in the minutes |
|---|---|---|---|---|---|
French safety document | Before work, occupied facilities | Facility operator, contractors | High | Safety | Safety section |
What it is
The plan de prévention (PDP) is required by the French Labor Code when an outside company works in a facility run by another employer. After a joint inspection (the inspection commune préalable), the host and the contractor list risks caused by their activities interfering, and the measures each side takes.
Closest US equivalent
An owner's contractor safety program in occupied facilities: hospital infection control risk assessments (ICRA), hot work and confined space permits, lockout procedures, and the host employer's orientation. OSHA's multi-employer citation policy addresses shared responsibilities.
In the minutes
The PDP appears before work starts in an occupied area, with the inspection date and signatures. Updates follow changes of scope or area.
Related terms
CSPS (French term) · Site safety orientation · Site-specific safety plan · Area turnover
<-